COUNTY |
HWY |
TYPE |
TONS |
1 |
BEXAR |
VA |
UPGRADE BRIDGE AND
APPROACH RAILING |
4,092 |
2 |
BRAZOS |
BS0006R |
HMA MILL AND INLAY |
3,644 |
3 |
CALDWELL |
FM1322 |
ACP, LVL-UP, FULL
DEPTH REPAIR & SC |
12,677 |
4 |
CALDWELL |
SH80 |
MILL, SEAL &
INLAY |
15,646 |
5 |
COLLIN |
FM455 |
HLD WDN, BS REP,OV,
GUARD RAIL |
10,410 |
6 |
COLLINGSWORTH |
FM1547 |
WIDENING OF A
NON-FREEWAY FACILITY |
18,858 |
7 |
CROSBY |
US62 |
PAVEMENT REPAIR,LEVEL
UP, AND OV |
71,844 |
8 |
DEWITT |
VA |
UPGRADE BRIDGE AND
APPROACH RAILING |
3,057 |
9 |
ELLIS |
FM85 |
ACP
OVERLAY,GR,STR,PVMT MKGS |
66,728 |
10 |
FAYETTE |
SH95 |
PAVEMENT
REPAIR AND SURFACING |
11,902 |
11 |
FREESTONE |
FM0246 |
ROADWAY RESTORATION |
282 |
12 |
GUADALUPE |
BS123B |
GR, BASE, STR, SURF,
CURB,PAV'T MRK |
14,819 |
13 |
HARRIS |
SH006 |
ASPHALT AND POTHOLE
REPAIR |
100 |
14 |
HAYS |
FM2770 |
MILL & THIN
OVERLAY |
4,369 |
15 |
HIDALGO |
IH2 |
OVERLAY |
58,995 |
16 |
HIDALGO |
US281 |
SMA/OVERLAY (NB &
SB LANES) |
174,933 |
17 |
HIDALGO |
FM1985 |
REHABILITATE ROADWAY |
75,984 |
18 |
HOPKINS |
SH11 |
HAZARD ELIMINATION
& SAFETY |
16,364 |
19 |
JOHNSON |
IH35W |
JOCO FLEX PVMT REPAIR |
15,000 |
20 |
JONES |
US83 |
PLANE, PVMNT REPR,
UNDERSL, OVERLAY |
24,538 |
21 |
KAUFMAN |
FM148 |
MILL,REPAIR,OL,STR,MRKS,SIGNS |
6,262 |
22 |
KENDALL |
SH0046 |
GRADING,HDWLLS,BASE,SURFACING,STRIPING |
630 |
23 |
LAMAR |
US0082 |
ON CALL MILL &
INLAY |
42,150 |
24 |
LUBBOCK |
US84 |
GRAD,TRT
SUBGRAD,CRCP,ACP,C&G,OVERP |
45,118 |
25 |
MITCHELL |
SH208 |
SPOT REPAIR,
UNDERSEAL, 2" OV SP-D |
13,634 |
26 |
REEVES |
IH10 |
PLANE,HOTMIX,SEALCOAT,MBGF,PAV-MRK |
36,837 |
27 |
ROCKWALL |
FM548 |
WDN,STR,REMX,OL,PV
MRKS |
29,647 |
28 |
RUSK |
FM1797 |
DRAINAGE STRUCTURES |
1 |
29 |
SAN AUGUSTINE |
SH 21 |
SAFETY TREAT FIXED
OBJECTS |
2,105 |
30 |
STARR |
US83 |
WIDEN BRIDGE CLASS
CULVERTS |
618 |
31 |
TARRANT |
IH0030 |
FLEXIBLE PAVEMENT
REPAIR |
10,000 |
32 |
WHEELERE |
FM592 |
REPLACEMENT OF
EXISTING BRIDGE |
248 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR
OCTOBER 2015 |
791,492 |