COUNTY |
HWY |
TYPE |
TONS |
1 |
ANGELINA |
US 69 |
SAFETY TREAT FIXED OBJECTS |
277 |
2 |
ARANSAS |
BS 35L |
MILL, SEAL & OVERLAY |
5,670 |
3 |
ARCHER |
US 82 |
OVERLAY |
42,529 |
4 |
BEE |
US 181 |
MILL, SEAL & OVERLAY |
11,511 |
5 |
BEXAR |
MR 681 |
MAINTENANCE EXISTING ROADS AND PARKING |
429 |
6 |
BLANCO |
US 281 |
LEVEL UP, SEAL, THIN OVERLAY |
6,309 |
7 |
BURLESON |
FM 60 |
OVERLAY |
19,986 |
8 |
CAMERON |
US 281 |
CONSTRUCT RURAL 4 LANE |
37,334 |
9 |
CAMERON |
SH 100 |
NSTALL WILDLIFE CROSSINGS |
1,539 |
10 |
CLAY |
US 82 |
UPGRADE BRIDGE AND APPROACH RAILING |
26,729 |
11 |
COLLIN |
SH 21 |
GRADE SEPARATION |
36,519 |
12 |
COLORADO |
SH 71 |
CONSTRUCT SUPER 2 LANES |
65,579 |
13 |
CULBERSON |
IH 10 |
MILL AND INLAY |
101,633 |
14 |
DENTON |
US 377 |
FULL DEPTH CONCRETE REPAIR |
7,282 |
15 |
DIMMITT |
US 277 |
PLANING, ACP, OVERLAY PAV MRK |
70,601 |
16 |
DUVAL |
SH 359 |
ACP, OVERLAY PAV MRK |
72,710 |
17 |
EASTLAND |
FM 2731 |
REPLACE CULVERTS |
5 |
18 |
ECTOR |
SH 191 |
RAMP IMPROVEMENTS |
4,881 |
19 |
EL PASO |
CS |
OFF-SYSTEM BRIDGE REPLACEMENT |
686 |
20 |
FAYETTE |
US 90 |
SAFETY TREAT FIXED OBJECTS |
230 |
21 |
FRANKLIN |
SH 37 |
RECONST & ADD 10' SHLDRS |
50,992 |
22 |
FREESTONE |
CR |
REPLACE EXISTING BRIDGE |
23 |
23 |
GALVESTON |
FM 517 |
BS REP, SC, ACP O/L AND PV MKS |
18,259 |
24 |
GRAYSON |
BU 377 |
LANDSCAPE DEVELOPMENT |
25 |
25 |
HARRISON |
US 59 |
CALLOUT CONCRETE PAVEMENT REPAIR |
200 |
26 |
HARTLEY |
US 385 |
OVERLAY |
59,211 |
27 |
HAYS |
IH 35 |
MILL & INLAY FRT RDS |
5,953 |
28 |
HIDALGO |
SH 107 |
REHABILITATE EXISTING ROADWAY |
11,708 |
29 |
HOPKINS |
SH 11 |
HAZARD ELIMINATION & SAFETY |
10,383 |
30 |
HOUSTON |
US 287 |
SAFETY TREAT FIXED OBJECTS |
389 |
31 |
JACKSON |
US 59 |
ACP OVERLAY |
42,661 |
32 |
JOHNSON |
BU 67 M |
MILL AND OVERLAY |
11,070 |
33 |
JOHNSON |
FM 3136 |
GR, BS, DR, STR, & PAVT |
22,855 |
34 |
JOHNSON |
FM 917 |
BASE REPAIR AND OVERLAY |
6,370 |
35 |
KAUFMAN |
FM 1836 |
PROVIDE ADDITIONAL PAVED SURFACE |
2,177 |
36 |
KIMBLE |
US 83 |
CONSTRUCT TRAFFIC SIGNALS |
3,345 |
37 |
LAMAR |
FM 906 |
REHABILITATION OF EXISTING ROAD |
1,048 |
38 |
LAVACA |
FM 532 |
RESTORE ROADWAY |
4,211 |
39 |
LIMESTONE |
FM 2705 |
WDN, GR, BS, SURF & ADD SHLDRS |
11,766 |
40 |
LUBBOCK |
US 84 |
GR,BASE,ACP,STR,OVERPASS,PAV MRK |
34,449 |
41 |
MADISON |
US 190 |
OVERLAY |
8,248 |
42 |
MARION |
US 59 |
BRIDGE PROTECTIVE MAINTENANCE |
77 |
43 |
MONTGOMERY |
VA |
BASE REPAIR AND PAVEMENT LEVELING |
65 |
44 |
NACOGDOCHES |
SL 224 |
RESURFACE WITH THIN OVERLAY MIXTURE |
4,925 |
45 |
ORANGE |
FM 105 |
GR, BS, STR. PVMT |
6,429 |
46 |
PECOS |
IH 10 |
GRADING,PAVING,DRAINAGE,ILLUM,PVMRK |
2,144 |
47 |
POLK |
VA |
REPAIR AND RESURFACE PAVED AREAS |
1,420 |
48 |
RED RIVER |
CS |
BRIDGE REPLACEMENT |
353 |
49 |
SAN AUGUSTINE |
SH 21 |
REPLACE BRIDGE AND APPROACHES |
3,088 |
50 |
TARRANT |
FM 1220 |
GRADING, BASE AND PAVEMENT |
35,135 |
51 |
TARRANT |
CS |
GR, BS, PAVEMENT AND STRIPING |
24,937 |
52 |
TARRANT |
SS 580 |
PAVT REPAIR AND OVERLAY |
20,418 |
53 |
TARRANT |
SH 360 |
MILL AND OVERLAY |
750 |
54 |
TAYLOR |
US 83 |
INSTALL MBGF AND PAVEMENT MARKINGS |
66 |
55 |
TRAVIS |
IH 35 |
MILL, SEAL, & OVERLAY FRTG RDS |
15,614 |
56 |
TRAVIS |
IH 35 |
MILL, SEAL & THIN OVERLAY FRT ROADS |
35,125 |
57 |
TYLER |
US 69 |
MILL AND INLAY |
2,170 |
58 |
VICTORIA |
US 59 |
DW ACP |
16,670 |
59 |
WICHITA |
US 281 |
OVERLAY |
30,530 |
60 |
WICHITA |
US 287 |
OVERLAY |
20,101 |
61 |
WILLIAMSON |
SH 29 |
UNDERSEAL & THIN OVERLAY |
8,487 |
62 |
WILLIAMSON |
FM 734 |
DEPTH REPAIR, UNDERSEAL & OV |
9,614 |
63 |
WILLIAMSON |
SH 29 |
UNDERSEAL & THIN OVERLAY |
10,101 |
64 |
WINKLER |
SH 302 |
PLANE, HOT MIX, AND PAV MRKS |
73,465 |
65 |
WISE |
FM 51 |
HMAC OVERLAY |
25,562 |
|
|
|
|
|
|
|
|
TOTAL TONNAGE FOR JANUARY 2016 |
1,165,028 |