VDOT Asphalt Co-Op’s in Full Swing
The end of the paving season means the renewal of the VDOT district asphalt co-ops and meetings. September saw meetings in Salem and Staunton districts. These meetings covered the work performed during the 2016 season, work planned for 2017 and potential specification changes for the coming years. Most specification changes are focused on continuing or expanding the use of incentives for asphalt cement content consistency in the mixes, consistency in in-place asphalt concrete density in the field, and timely pavement markings. In October, November and December, district asphalt meetings are planned for Lynchburg (12/9), Staunton (10/13), NOVA (10/28) and Hampton Roads (11/1) districts. To date, no meetings have been scheduled for Bristol, Fredericksburg or Culpeper Districts. Contact your local VDOT Materials Section for more information on these meetings.